Pembroke Park, FL
Pembroke Park Florida Homepage
Search

News Flash

Town Hall Parking Lot Resurfacing Project

Pembroke Park News Posted on October 21, 2025

Town to Resurface Parking Lot at Town Hall


The Town of Pembroke Park will be resurfacing the parking lots at its Town Hall building. The work is scheduled over two separate weekends – shutting down half of the front and back parking lot one day, and then the other half the next scheduled work day.

The work is scheduled for (please refer to the map below):

  • Green Phase (north side):                Sat., Nov. 8 and Sun., Nov. 9
  • Red Phase (south side):                    Sat., Nov. 15 and Sun., Nov 16.

Each phase will close the part of the front and back parking lot areas (same side for each phase) – no vehicles can enter or exit the areas being resurfaced.

We apologize for any inconvenience this may cause and thank you for your understanding.

Phasing Map



Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow